McArthur Ridge Pinot Noir Holdings | 2003 | McArthur Ridge Pinot Noir Holdings, Springvale, drawings 201-220. (These drawings are drafts and state 'proposed' but this project, as per the plans, is now complete.) | 20 | Hanger 21 |
Shape Correction Blacks Hotel corner, Ophir | 1989-1990 | Ophir Corner - Plan and longitudinal section. Job No.12476, sheets 1-3 | 3 | Hanger 23 |
Danseys Pass Road - Slip Realignment | 1990 | Job No. 12482, sheet 1. Slip near culvert 105 | 1 | Hanger 24 |
Danseys Pass Road Flood Damage Repair | 1991 | Job No. 12681, sheet 1 | 1 | Hanger 24 |
Ranfurly-Naseby Road, Coal Pit Corner Improvements | 1989-1990 | Job No. 12413, sheet 1 of 2. Note: Sheet 2 is missing. | 1 | Hanger 24 |
Welcome Inn Hill Corner Realignment, Naseby | 1990 | Job No. 12490/1, sheet 1 of 2. Note: Sheet 2 is missing. Sheet 1 is Plan of Longitudinal Section | 1 | Hanger 24 |
Welcome Inn Hill - Naseby Realignment - Stage 2 | 1991 | Job No. 12490/1R, sheet 1R of 3. Not: Sheets 2 and 3 are missing. Contract No.90/128 | 1 | Hanger 24 |
Blackman's Road Shape Correction | 1991/1992 | Job No. 12979, sheets 1-7, Contract No. 91/105 | 7 | Hanger 25 |