Update Thursday 27 June 2024
Both lanes of Neplusultra Street are open and all fencing has been removed.
***
The Council's contractor HEB has established a work site in part of the Big Fruit carpark off Murray Terrace in Cromwell, to allow installation of a water pipe for the Cromwell Rising Main project, under State Highway 8B.
Barry Ave – Waenga Drive – Murray Terrace detour 1-12 July 2024
Installation of the pipe crosses Barry Ave, from the Bruce St Greenway to Lode Lane. While this work is completed, Barry Ave will be one-lane. Direction of travel will be south-bound, while the north-bound lane will be detoured along Waenga Drive to Murray Terrace.
The detour will be in place from 1-12 July. Note: On the evening of Wednesday 3 July, both lanes will be closed, and the detour route will be in place for all traffic.
Lode Lane closed 8 July - 9 August 2024
The work will require Lode Lane to be shut between 8 July-9 August. While Lode Lane is closed, a temporary bus stop will be in place nearby on Barry Ave. Access to the council carpark will be available from Waenga Drive.
Please take care and follow all signage.