Heeney's Creek Bridge | 1929 | Flood damage restoration 1929. M.C.C 076 | 1 | Hanger 9 |
German Creek Bridge | 1970 | Job No. 6159. 3 Preliminary sheets not for construction, 2 sets of 3 actual construction plan sheets, 1 set being the original. Plans are accompanied by Specification papers and letter of return from Duffil Watts and King | 9 | Hanger 10 |
Greers Bridge | 1962 | Bridge spans Boundary creek on Swinburn Road. Job No. 4287, sheets 1 and 2 | 2 | Hanger 10 |
Cogan's Bridge, Puketoi - Patearoa Road | 1929 | Bridge spans the Taieri river | 1 | Hanger 9 |
Scrub Burn Bridge Renewal | 1931 | MCC 090 | 1 | Hanger 14 |
Taieri River Bridge | 1957/58 | Job No. 2788, sheets 1-10 inclusive | 10 | Hanger14 |
Hyde to McCraes Flat Bridge over the Taieri River | 1975 | Job No. 8146, sheets 1, 1, 2, S1, S2, & S3 | 6 | Hanger 14 |
State Highway 85 Eden Creek Improvements | 1983/84 | 6 | Shelf A4 |
Tiroiti Bridge over the Taieri river | 1963/64 | Job No. 4033 sheets1 and 1A through to sheet 8 | 9 | Hanger 14 |
Capburn Bridge State Highway 87 | 1967-1968 | Job No 4799, sheets 2-7 of 7 and sheet 9. (Sheet 1 is missing.) | 7 | Hanger 14 |
Idaburn Railway Overbridge road formation | 1920 | Specification No.181, MCC 023, signed by county engineer, F.W.Butler 14/1/1920 | 1 | Hanger 1 |
Kyeburn 'Nobbler' Bridge | 1938 | Bridge is located on Naseby to Dansy's Pass road. Contract no. 302, MCC 136. Three extra plan sheets were recovered from a shed in the Maniototo and have been attached to this scan. | 4 | Hanger 1 See also Plan Book 2 |
Spain's Creek Bridge | 1935 | Brown's Road, Auripo, MCC 114 | 1 | Hanger 1 |
Horseburn Bridge Re-deck | 1938 | Contract No. 301, MCC 137, between secs. 14 & 22 Blk III, Rock & Pillar SD | 1 | Hanger 1 |
Wetherburn Bridge, McLeod's Road | 1929 | Flood damage restoration. MCC 078 | 1 | Hanger 1 |
Eweburn Bridge, Kearney's Road | 1930 | Light traffic and stock bridge. MCC 079. The original blueprint is also held in plan book 2 | 1 | Hanger 1 |
Kyeburn Bridge - Scott's Lane | 1930 | Contract No. 179, MCC 080. The blue print is held in Plan Book 2. | 1 | Hanger 1 |
Rocky Creek Bridge, Waipiata Styx Road | 1930 | Contract No. 173, MCC 081 | 1 | Hanger 1 |
Sowburn Bridge | 1934 | MCC 099 (amended see MCC 106) Waipiata - Styx Construction | 1 | Hanger 1 |
Kyeburn Bridge, Young's crossing. Naseby - Dansey's Pass Road | n.d. | Contract No. 251, MCC 112, Naseby to Dansey's Pass Road, PWD 89183 sheets 1-4, PWD 40417 sheet 1 Pile detail and PWD 73990 sheet 2, Pile Shoe. See also Plan Book 2 | 7 | Hanger 1 |
Donald Stuart' Creek Bridge, St Bathans Loop Main Highway | 1953-1956 | Contract 376. MCC 243 a, b, d and MCC 320 | 4 | Hanger 1 |
Muddy Creek Bridge, St Bathans Survey District | 1919 | MCC 020. This bridge was replaced by culvert 123, n.d. | 1 | Hanger 1 |
Idaburn River Bridge, Ida Valley School Road | 1925 | MCC 047. | 1 | Hanger 1 |
Idaburn Bridge, Main Ida Valley Road | 1928 | MCC 067 | 1 | Hanger 1 |
Three Mile Creek Bridge, St Bathans Loop Highway | 1929 | Contract No. 147, MCC 068. Notation on plan suggests a renewal? Another notation strikes out the word Three in Three Mile Creek and indicates the number 5 i.e. Five Mile Creek. | 1 | Hanger 1 |
Sowburn Bridge, Rocks Crossing above main Rd | 1922 | MCC 030. Notation in pencil on plan states "not built" see 35b | 1 | Hanger 1 |
Pigburn Bridge, Patearoa Waipiata Rd | 1926 | Contract No. 100, MCC 05. There is a notation on this plan saying "Not built." | 1 | Hanger 1 |
Idaburn Bridge, Hills Creek, Palmerston to Clyde Main Rd | 1923 | MCC 040, Sheet 1, only record | 1 | Hanger 1 |
Hogburn Sludge Channel Bridge, Inders Rd | 1936 | MCC 124. Notation indicates "amended, see 129 plan book 2." | 1 | Hanger 1 |
Eweburn (Halls) Bridge, Waipiata/Gimmerburn Rd | 1954/55 | Contract 392, MCC 296 a and b, MCC 305. Includes Deck and kerb reinforcing, site and approaches abutment details, and the reinforcing schedule | 3 | Hanger 1 |
Whetherburn Bridge, Gibson Rd | 1953/54 | Contract No. 387, Pile layouts MCC 281, Proposed Locality plan Mcc 256, Locality and approaches Mcc 295a, Reinforcing schedule Mcc 295b | 4 | Hanger 1 |
Taieri Bridge, Paerau linnburn school bus route. Access Metalling & Culverts | 1955 | Back Blocks Access - 1954/1955 - 1956/57 Programme, Paerau Linburn School Bus Route MCC 309 | 1 | Hanger 1 |
Whetherburn Bridge, Wilson's Rd | 1952 | Approaches and locality plan, Abutment and wingwall details. MCC 211a, sheet 1 of 4. | 1 | Hanger 1 |
Hayes Bridge | 1957 | Idaburn - Omakau Road (by Hayes Road) MH 227. Job No. 2775 sheets 1-6. Letter from DWK re return of originals. | 6 | Hanger 10 |
Dundass Bridge Ida Valley Railway Station | 1958 | (Towards Ida Valley Railway Station) Job No. 2789, sheets 1 -4, MH 664. Original drawings were returned to MCC from DWK in November 1981. | 4 | Hanger 10 |
Eweburn Bridge, Barney's Lane | 1928 and 1968 | Includes 2 sheets with annotation and slight changes. Includes specification booklet and contract conditions booklet. Job No. 4826, 2 sets of sheets 1-4 and 1 sheet 5. See also MCC 063, plan Book 2. | 10 | Hanger 11 |
Loganburn Bridge | 1919 and 1981 | Job No. 9815, sheets 1-5, stamped preliminary. Includes general arrangement, abutment details, amendments, inspection and drainage hole details and guardrail connection details. See also Plan Book 2 for sheet no. MCC 019, 1919. | 5 | Hanger 11 |
Manuherikia River Bridge, St Bathans Loop road | 1957 | Job No. 2790, sheets 1-7, includes schedule of reinforcement and letter from DWK accompanying return of originals in 1981. | 7 | Hanger 11 |
Sharkey's Road Bridge, Wetherburn Stream | 1931 &1957/58 | Job No. 2787, sheets 1-3 and letter from DWK accompanying return of originals in 1981. Scan also includes sheet MCC 086 1931 found in plan book 2. | 4 | Hanger 10 |
School Bridge, over Idaburn River | 1963 | Job No. 4288, sheets 1-6 and letter accompanying return of originals from DWK in 1982. | 6 | Hanger 12 |
Creamery Bridge, Ranfurly/Patearoa Road | 1962 | Job No. 4179, sheets 1, 2, 4, 5, 6 (x2), 7, 8 and letter from DWK accompanying return of originals in 1982 | 8 | Hanger 10 |
Eden Creek Culvert, Gimmerburn/Waipiata Rd | 1956 | Job No. 2727, 2 sheets, MCC 323 and MCC 337, and letter from DWK accompanying the return of originals 1981. | 2 | Hanger 11 |
Dunstan Creek Bridge, St Bathans Loop Road | 1961 | Job No. 4113, sheets 0-7, plus 1 print of 4113/sheet 1 with accompanying instruction letter dated 1962. A letter from DWK accompanies the return of originals dated 1982. | 8 | Hanger 12 |
Pigburn Bridge, Patearoa Waipiata Rd | 1965 | Job No. 4542, sheets 1-6. See bridge detail on Hanger 1 | 6 | Hanger 20 |
Dunstan Creek Bridge Extension, St Bathans Loop Road | 1946 | Contract No. 111, MCC 053. Includes a letter dated November 1946 describing Tender advertising. | 1 | Hanger 11 |
Hogburn (Gregory's) Bridge | 1952-1956 | Job No. 2725, sheets 1, 2 & 5. Includes steelwork and reinforcing schedule. MCC 339a site, pile, road and abutment details. (3 sheets missing from MCC 339). | 4 | Hanger 11 |
Waipiata Green Bridge | 1985 | Job No. 10652, sheet no. 1, Record of Measurements | 1 | Hanger 4 |
Mundell's Bridge Replacement | 1975 | Job No. 6564, sheet 5 | 1 | Hanger 5 |
White Sow Valley Bridge | 1969 | Job No. 4914, sheet 1 and letter from DWK returning drawing, 1982 | 1 | Hanger 12 |
Repairs to Culvert No.106 (Dansey's Pass) | 1989 | Job No. 12356, sheet 1. General Arrangement and Details | 1 | Hanger 5 |
Little Kyeburn Bridge No. 54 , Replacement | 1988 | Job No. 12189, sheets 1-6, design report sheet 1 | 7 | Hanger 5 |
Linn Burn Bridge Replacement, Blackball Road | 1987 | Job No. 12030 sheet 1, culvert inlet/outlet structure details | 1 | Hanger 6 |
Dansey's Pass Bridge, Naseby - Kyeburn Diggings Road | 1968 | Job No. 4841 sheets 1-6, 1 sheet of notations and workings, a letter dated June 1982 from Duffil Watts and King returning the original drawings. | 7 | Hanger 6 |
Young's Dodger Bridge Widening | 1969 | Job No. 4969 sheet 1 of 1, Bridge ID 232, Bridge 13, Bridge name 137, Gimmerburn - Waipiata Road | 1 | Hanger 12 |
Replacement of Bridge No. 5, Woolshed Creek | 1985 | Job No. 10770. Loop Rd, St Bathans | 1 | Hanger 6 |
Taieri Bridge redecking | 1948 | Maniototo - Waihemo County boundary, Hyde - McCraes Road - Contract No. 344, MCC 178 | 1 | Plan Book 2 |
Hall Dodgers Bridge, Gimmerburn Waipiata road | 1946 | First 4 Sheets of bridge specifications were not required/not built (see attached correspondence) 5th sheet is of existing bridge 1941.3 letters of explanation between MCC and FJ Williams Civil Engineers, Dunedin. | 5 | Plan Book 2 |
Manuherikia Bridge, St Bathans Downs Road | 1939 | Includes Approach plan and Reinforcement Bending Schedules | 8 | Plan Book 2 |
Horseburn Bridge Redeck | 1938 | Maniototo and Waihemo boundaries. Between sections 14 & 22, Block III, Rock and Pillar | 1 | Plan Book 2 |
Spedderi's Bridge, Puketoi to Highfield Road | 1937 | MCC 131 There is also a copy held on Hanger 1 | 1 | Plan Book 2 |
Hogburn Sludge Channel Bridge, Inders Rd | 1937 | MCC 129 & 124 | 2 | Plan Book 2 |
Spains Creek Bridge | 1935 | MCC 114 | 1 | Plan Book 2 |
Little Kyeburn Bridge | 1935 | Superstructure and Approaches MCC109 | 1 | Plan Book 2 |
Spec Creek Bridge, Naseby to Kyeburn Diggings Road | 1935 | MCC107 | 1 | Plan Book 2 |
Kyeburn Bridge, Naseby to Dansey's Passs Road | 1934 | MCC 098 | 1 | Plan Book 2 |
Becks Creek Bridge, Mees Road | 1931 | Contract No. 193. MCC 085 | 1 | Plan Book 2 |
Kyeburn Bridge - Scott's Lane | 1930 | MCC 080. There is also a copy held on Hanger 1. | 1 | Plan Book 2 |
Eweburn Bridge - Kearney's Road | 1930 | MCC 079. See also Hanger 1 | 1 | Plan Book 2 |
Whetherburn Bridge - McLeod's Road | 1929 | Flood damage restoration 1929 A copy is also held on Hanger 1 | 1 | Plan Book 2 |
Cogan's Bridge - Puketoi - Patearoa Road | 1929 | MCC 072 | 1 | Plan Book 2 |
Thompson's Creek Bridge - Matakanui - Drybread Road | 1929 | MCC 071, Contract No. 829 | 1 | Plan Book 2 |
Otamatakou Proposal | 1928 | MCC 062. Very faded ink notation "Sheep bridge over Boundary Creek, 5? Miles in Waitaki County from Mt Buster" | 1 | Plan Book 2 |
Proposed sheep bridge - Boundary Creek. | 1927 | MCC 060. Not built - notation says not built see 62 (MCC 062?) 1 Sheet | 1 | Plan Book 2 |
Cameron's Bridge over Taieri River (Also called Tiroiti Bridge) | 1927 | Alterations to Cameron's bridge over Taieri River at Tiroiti showing details of widening. MCC 058 | 1 | Plan Book 2 |
Factory Bridge, Hogburn Channel, Waipiata to Naseby road | 1924 | MCC 044 | 1 | Plan Book 2 |
Taieri River Bridge, Loganburn Ford road | 1923 | MCC 041 | 1 | Plan Book 2 |
Sowburn Bridge, Patearoa - Paerau Road | 1923 | Rocks Crossing above main road. Plan No's 010, 011 and 012. MCC 039. Plan no. 012 is the amended site plan. There is another copy of plan 011 on Hanger 1 | 3 | Plan Book 2 |
Beatties Bridge Extension, Dunstan Creek | 1922 | Beatties Road leading to Becks - St Bathans main road. Plan no. 014, MCC 032, Contract 51 | 1 | Plan Book 2 |
Sowburn Bridge - Main Patearoa - Paerau Road | 1922 | Not built. See Sowburn bridge, Rocks Crossing above main road. Plan no. 011, MCC 030. General details see Plan no. 010 Sowburn Bridge 1923 | 1 | Plan Book 2 |
Rough Sketch of bridge over Horseburn | 1921 | MCC 024 | 1 | Plan Book 2 |
Linnburn Ford Bridge, Taieri River | 1915 | MCC 013 | 1 | Plan Book 2 |
Upper Kyeburn Bridge | 1897 | Government grant vote 91 Item 69. work completed May 6th 1897, Contract 558, MCC 010 | 1 | Plan Book 2 |
Capburn Bridge, Taieri River | 1895 | MCC 006 | 1 | Plan Book 2 |
Plan of bridge sites, Taieri River | 1895 | MCC 005 | 1 | Plan Book 2 |
Barbar's Ford Bridge | 1961 | Job no. 4114, sheets 1-3 | 3 | Hanger 12 |
Taieri River - Law's Ford | 1907 | Sheet is of a portion of Contract One | 1 | TBA (Held in tube) |
Dansey's Pass Road Stone Bridge Replacement | 1978 | Job No. 8946, sheets 1 & 2. Stream profile on pipe (1) and longitudinal section of road (2). Indicates 'Preliminary Plans' | 2 | Hanger 14 |
Bridge over Shag River | 1875 | Bridge over the Shag River drawing no.3 approaches and new bay | 1 | TBA (Held in tube) |
Bridge Hogburn Gully Blocks, Blocks 2 & 7 | n.d. | Plan was recovered along with others dated between 1875 and 1907. Indicate bridge is 6 miles from railway station (Ranfurly?) Contract no. 3 | 1 | TBA (Held in tube) |
Bridge over Hogburn | n.d. | Plan was recovered along with others dated between 1875 and 1907. c. late 1870's? | 1 | TBA (Held in tube) |
Eweburn Bridge - Allison Lane | 1957-1959 | Job No. 2810, sheets 1-4. Also, job no. 2644/10 reconstruction, priming and sealing Maitland - Matheson's Corner. | 5 | Hanger 14 |
Swinburn Creek Bridge Repairs | 1962 | Job No. 4277, sheet 1 | 1 | Hanger 14 |
Bleach's Bridge - Ranfurly - Patearoa Road | 1958-1959 | Job No. 2917, sheets 1-6 | 6 | Hanger 14 |
Sowburn Bridge Replacement | 1982-1984 | Job no. 9960, sheets 1, 2, CP1 and CP2 | 4 | Hanger 15 |
Harrex Bridge | 1962-1963 | Job No. 4289, sheets 1-9 | 9 | Hanger 20 |
No. 1 Bridge in Block V Swinburn District | 1925 | Highway No. 124 - H2, MCC 049 | 1 | Hanger 20 |
Nobbler's Bridge Danseys Pass Road | 1980 | Job No. 9504. sheet 1, repairs to abutment and adjacent pier | 1 | Hanger 20 |
O'Neills Road Bridge No. 1 | 1965 | Job No. 4489, sheets 1-3 | 3 | Hanger 20 |
O'Neills Road Bridge No. 2 | 1965 | Job No. 4491, sheets 1-2 | 2 | Hanger 20 |
Loganburn Ford Bridge | 1965-1966 | Job No. 4579, sheets 1-4 | 4 | Hanger 20 |
Styx Bridge | 1965-1966 | Job No. 4609, sheets 1-4 | 4 | Hanger 20 |
Beaties Bridge | 1964 | Job No. 4451, sheets 1-4, sheet 6 and sheet with detail of 45ft. precast pre-stressed beam | 6 | Hanger 20 |